|   | 
Details
   web
Record
Author Duphil Romain, Possenti Philippe, Piard Luc,
Title A new leak-tight borehole casing at Dome Concordia station, Antarctica, for the SUBGLACIOR project Type Journal Article
Year (down) 2014 Publication Annals of Glaciology Abbreviated Journal
Volume 55 Issue 68 Pages 351-354
Keywords
Abstract In the frame of the SUBGLACIOR project, a new type of casing has been installed for testing during the 2013/14 austral summer season at Dome Concordia station, Antarctica. The SUBGLACIOR probe requires a full fluid column up to the surface, in order to circulate fluid for icechips recovery. This makes it essential that the casing is leak-tight through the porous firn column. We have evaluated existing solutions before opting to test a new method. This new system is made of polyethylene pipes which are welded together at the surface while the casing pipes are lowered into the reamed borehole. It is simple and lightweight and allows the casing to be installed quickly with
optimum chance of being leak-tight. The installed casing has been tested both with compressed air and drilling fluids and has proven to work.
Programme 1119
Campaign
Address
Corporate Author Thesis
Publisher International Glaciological Society Place of Publication Editor
Language Summary Language Original Title
Series Editor Series Title Abbreviated Series Title
Series Volume Series Issue Edition
ISSN 02603055 ISBN Medium
Area Expedition Conference
Notes Approved yes
Call Number Serial 5932
Permanent link to this record