|
Merkling T, Agdere L, Albert A, Durieux R, Hatch SA, Danchin E & Blanchard P. (2014). Experimental manipulation of hatching asynchrony influences the course and outcome of sibling competition..
Abstract: Australian Society for the Study of Animal Behaviour 2014 (Katoomba, NSW, Australia) 1-4 July 2014
Programme: 1162
|
|
|
Testut L. (2014).
|
|
|
L. Testut and A.S Unnikrishnan. (2014). Overview of the Sea Level research activities in France, Indo-French collaboration : current status and perspective.
.
Abstract: 20 January 2014, INCOIS, Hyderabad (India).
Programme: 688
|
|
|
Calzas M, C. Brachet, C. Drezen, L. Fichen, C. Guillerm, A. Guillot, L. Testut and P. Bonnefond. (2014). New technological development : Tide Station, Static and Towed GPS Buoys for Satellite Altimetry Calibration.
Abstract: AGU Fall Meeting, 15-19 December 2014, San Francisco
Programme: 688
|
|
|
Calzas M, C. Brachet, C. Drezen, L. Fichen, C. Guillerm, A. Guillot, L. Testut and P. Bonnefond.
. (2014). New technological development for CAL/VAL activities.
Abstract: OST-ST Meeting 26-31 October 2014, Germany.
Programme: 688
|
|
|
. (2014). A novel experimental study of aeolian snow transport in Adelie Land (Antarctica)
. Cold Regions Science and Technology, 108, 125–138.
Keywords: Aeolian transport, Antarctica, Blowing snow, Drifting snow,
Programme: 411,1013
|
|
|
Triest J, Alemany O, . (2014). Drill fluid selection for the SUBGLACIOR probe: a review of silicone oil as a drill fluid
. Annals of Glaciology, 55(68), 311–321.
|
|
|
Duphil Romain, Possenti Philippe, Piard Luc, . (2014). A new leak-tight borehole casing at Dome Concordia station, Antarctica, for the SUBGLACIOR project
. Annals of Glaciology, 55(68), 351–354.
Abstract: In the frame of the SUBGLACIOR project, a new type of casing has been installed for testing during the 2013/14 austral summer season at Dome Concordia station, Antarctica. The SUBGLACIOR probe requires a full fluid column up to the surface, in order to circulate fluid for icechips recovery. This makes it essential that the casing is leak-tight through the porous firn column. We have evaluated existing solutions before opting to test a new method. This new system is made of polyethylene pipes which are welded together at the surface while the casing pipes are lowered into the reamed borehole. It is simple and lightweight and allows the casing to be installed quickly with
optimum chance of being leak-tight. The installed casing has been tested both with compressed air and drilling fluids and has proven to work.
Programme: 1119
|
|
|
Alemany O, Chappellaz J, Triest J, Calzas M, Cattani O, Chemin JF, Desbois Q, Desbois T, Duphil R, Falourd S, Grilli R, Guillerme C, Kerstel E, Laurent B, Lefebvre E, Marrocco N, Pascual O, Piard L, Possenti P, Romanini D, Thiebaut V, Yamani R, . (2014). The SUBGLACIOR drilling probe: concept and design
. Annals of Glaciology, 55(68), 233–242.
|
|
|
Grilli R, Marrocco N, Desbois T, Guillerm C, Triest J, Kerstel E, Romanini D, . (2014). Invited article: SUBGLACIOR: an optical analyzer embedded in an Antarctic ice probe for exploring the past climate.
. The Review of scientific instruments, 85(11), 111301.
|
|